Skip to main content

Keating, M., New Orleans, Louisiana, to Archbishop Anthony Blanc, New Orleans, Louisiana, 1856 April 3

 Item
Identifier: CANO VI-1-j
Please use the Collection Organization below to place requests

Scope and Contents

Supplement. Considering that the work on the vaults would be finished before the report would be handed in, Keating visited the cemetery again and finding the work given up as finished, he reports the following: 1. The old roof is cemented and evidence already exists that Keating was right in saying it could not last long for there are cracks; 2. As the work is finished, it is perhaps not desirable to incur further expense yet evidence of a clumsily finished job exists. For a complete job, considerably more should be done for which new specifications would be necessary. Keating signs as civil engineer and surveyor. A.L.S. On the same paper:

Dates

  • Creation: 1856 April 3

Language of Materials

In Spanish, French, Latin, and English.

Repository Details

Part of the University of Notre Dame Archives Repository

Contact:
607 Hesburgh Library
Notre Dame Indiana 46556 United States
(574) 631-6448